11424.1 | ADDISON | VA | | $381,223 | $0 | $381,223 |
20128 | CARROLLTON | VA | BNSF PASSENGER RAIL (DALLAS COUNTY SECTION) FROM JOSEY LANE/KELLER SPRINGS / DENTON COUNTY LINE | $32,364 | $32,105 | $259 |
11745 | COCKRELL HILL | CS | ON COCKRELL HILL RD FROM NORTH OF MOLER STREET / DAVIS STREET | $5,040,299 | $0 | $5,040,299 |
11532 | COPPELL | CS | FREEPORT PKWY FROM SH 121 / SANDY LAKE ROAD | $1,471,883 | $13,479,061 | ($12,007,178) |
11533 | COPPELL | CS | FREEPORT PARKWAY FROM SANDY LAKE ROAD / RUBY ROAD | $3,352,730 | $10,907,711 | ($7,554,981) |
11642.8 | COPPELL | VA | INCIDENT MANAGEMENT FREEWAY BLOCKING EQUIPMENT | $89,867 | $89,867 | $0 |
11726 | DALLAS | CS | ON RIVERFRONT BOULEVARD FROM CADIZ STREET / NORTH OF CONTINENTAL AVENUE | $0 | $0 | $0 |
2310.1 | DALLAS | CS | DENTON DRIVE FROM SOUTH OF WALNUT HILL LANE / NORTH OF ROYAL LN | $550,000 | $550,000 | $0 |
20190 | DALLAS | CS | ON SYLVAN AVENUE AT TRINITY RIVER | $9,203,000 | $0 | $9,203,000 |
11726.3 | DALLAS | CS | ON RIVERFRONT BOULEVARD FROM UP RR / NORTH OF CONTINENTAL AVENUE | $6,840,000 | $0 | $6,840,000 |
11726.4 | DALLAS | CS | RIVERFRONT BLVD FROM CADIZ STREET / JUSTICE CENTER WAY | $24,447,713 | $0 | $24,447,713 |
21026 | DALLAS | CS | MARTIN LUTHER KING BLVD/TREC PROJECT FROM SH 352 / BOTHAM JEAN BLVD (PREVIOUSLY LAMAR AVE) | $500,000 | $0 | $500,000 |
11600 | DALLAS | CS | 10TH STREET FROM IH 35E / CLARENDON | $2,400,000 | $0 | $2,400,000 |
11620 | DALLAS | CS | EADS/HUTCHINS AVE FROM EADS AVE AND EAST COLORADO BLVD / HUTCHINS AND 8TH ST | $5,600,000 | $0 | $5,600,000 |
21027.3 | DALLAS | CS | ON HAMPTON RD AT LEATH ST, PERRYTON DR, DENNISON ST, WEST COMMERCE ST, COLORADO BLVD, PLYMOUTH RD, 12TH ST, WRIGHT ST, & / RED BIRD LN; ON LANCASTER RD AT ELMORE AVE, SANER AVE, CORNING AVE, KIEST BLVD, OAKLEY AVE, FORDHAM RD, ANN ARBOR AVE, | $8,400,000 | $0 | $8,400,000 |
20263 | DALLAS | IH 635 | HOV 2 AND 3+ SUBSIDY FOR IH 635 (LBJ) | $10,740,000 | $0 | $10,740,000 |
11018.2 | DALLAS | VA | KATY TRAIL FROM ELLSWORTH AVE / WORCOLA STREET IN CITY OF DALLAS | $6,480,000 | $6,480,000 | $0 |
11978 | DALLAS | VA | SIDEWALKS AND LANDSCAPING IN DALLAS CENTRAL URBAN CORE | $1,000,000 | $931,128 | $68,872 |
20067 | DALLAS | VA | TRINITY STRAND TRAIL FROM WEST OF IH 35E (IN BETWEEN OAK LAWN AND MOTOR) / MOTOR STREET | $4,536,039 | $4,529,568 | $6,471 |
20134 | DALLAS | VA | DALLAS CBD STREETCAR CIRCULATOR EXPANSION-PHASE 1 FROM DOWNTOWN DALLAS / OAK CLIFF | $7,628,759 | $20,071,502 | ($12,442,743) |
20135 | DALLAS | VA | ATMS COMMUNICATIONS NETWORK / AT VARIOUS CITYWIDE LOCATIONS | $2,425,600 | $1,396,177 | $1,029,423 |
20127 | DALLAS | VA | DART S. OAKCLIFF LRT FROM LEDBETTER / UNT CAMPUS | $0 | $0 | $0 |
20302 | DALLAS | VA | DALLAS CBD STREETCAR: SOUTH FROM OAK CLIFF TO THE BISHOP ARTS DISTRICT; FROM COLORADO BLVD/BECKLEY AVE / ZANG BLVD/DAVIS ST; AND YOUNG ST FROM UNION STATION/HOUSTON ST TO THE CONVENTION CENTER HOTEL | $3,500,000 | $0 | $3,500,000 |
11642.1 | DALLAS | VA | INCIDENT MANAGEMENT FREEWAY BLOCKING EQUIPMENT | $300,000 | $298,911 | $1,089 |
20160 | DALLAS | VA | MCKINNEY AVENUE TRANSIT AUTHORITY ADA ACCESSIBILITY STUDY | $500,000 | $0 | $500,000 |
21027.1 | DALLAS | VA | ON WALNUT HILL LN AT WINEDALE DR, TIBBS ST, BOEDECKER ST, WALNUT GLEN TOWER, & RAMBLER; MIDWAY RD AT NORTHHAVEN DR; / ON GREENVILLE AVE AT BLACKWELL ST, PINELAND DR, & MEADOW RD; ON ROYAL LN AT GEMINI LN, BROCKBANK/DENNIS RD, & WELCH RD | $4,630,909 | $0 | $4,630,909 |
21027.2 | DALLAS | VA | ON FOREST LN AT NUESTRA DR & PARK CENTRAL DR; ON HILLCREST RD AT CHURCHILL WAY, NORTHAVEN RD, & MEADOW RD; / ON MARSH LN AT NORTHAVEN RD, MERRELL RD, & CLOVER LN; ON INWOOD RD AT WILLOW LN & NORTHAVEN RD | $4,000,000 | $0 | $4,000,000 |
20133 | FARMERS BRANCH | VA | STATION AREA TRAILS ALONG DENTON DRIVE / AT VALLEY VIEW LANE (NEAR DART RAIL STATION) | $233,766 | $234,094 | ($328) |
20124 | GARLAND | CS | ON PLEASANT VALLEY ROAD; FROM RICHFIELD DRIVE AT CREEK MEADOW LANE / MILES ROAD | $3,539,272 | $0 | $3,539,272 |
20261 | GARLAND | VA | MGR BIKEWAY FROM JUPITER & APOLLO / SOUTH CITY LIMITS AT DUCK CREEK | $2,444,000 | $0 | $2,444,000 |
11642.2 | GARLAND | VA | INCIDENT MANAGEMENT FREEWAY BLOCKING EQUIPMENT | $360,000 | $0 | $360,000 |
11528.1 | GRAND PRAIRIE | CS | GIFFORD/BAGDAD/ACCESS MANAGEMENT FROM MACARTHUR BLVD / BAGDAD | $3,524,000 | $3,524,000 | $0 |
11528.2 | GRAND PRAIRIE | CS | ON MACARTHUR RD; FROM IH 30 / HUNTER-FERRELL | $12,000,000 | $0 | $12,000,000 |
11840 | GRAND PRAIRIE | CS | 15TH ST CONNECTION / AT IH 30/BELT LINE RD PARK & RIDE FACILITY | $390,830 | $390,830 | $0 |
20213 | GRAND PRAIRIE | CS | WILDLIFE PARKWAY FROM SH 161 / BELT LINE RD | $25,000,000 | $0 | $25,000,000 |
11901 | IRVING | VA | PEDESTRIAN CONNECTION BETWEEN LAS COLINAS AUTOMATED PEOPLE MOVER / AND THE DART ORANGE LINE STATION | $420,000 | $394,160 | $25,840 |
11642.5 | LANCASTER | VA | INCIDENT MANAGEMENT FREEWAY BLOCKING EQUIPMENT | $89,774 | $0 | $89,774 |
21012 | MESQUITE | LAWSON RD | SOUTH OF SCYENE RD / SCYENE RD | $2,929,728 | $0 | $2,929,728 |
20136 | MESQUITE | VA | MESQUITE HIKE & BIKE TRAIL - PHASE 1: NORTHEAST MESQUITE CITY LIMIT TO IH 30 TO NORTHWEST DRIVE TO TXU/ONCOR EASEMENT / TOWN CENTRE DRIVE TO IH 635 | $3,114,918 | $0 | $3,114,918 |
20261.2 | MESQUITE | VA | MGR TRAIL AT MESQUITE CITY LIMITS NEAR DUCK CREEK / MESQUITE HERITAGE TRAIL NEAR NORTHWEST DR | $400,000 | $0 | $400,000 |
20304.1 | MESQUITE | VA | VEHICLE BLOCKER TO BE USED AT CRASH SITES ON FREEWAYS IN MESQUITE (IH 635, IH 30, US 80) | $39,200 | $0 | $39,200 |
21045 | RICHARDSON | CS | CITY OF RICHARDSON ADAPTIVE TRAFFIC SIGNALS; WATERVIEW/TATUM, RUTFORD/SYNERGY PARK, RENNER/SYNERGY PARK, / CAMPBELL/WATERVIEW, RENNER/CUSTER, RENNER/ALMA, RENNER/RENNER PKWY, CAMPBELL/COLLINS, CAMPBELL/CANYON | $150,000 | $0 | $150,000 |
20145 | ROWLETT | CS | ON MERRITT ROAD FROM CHIESA ROAD / PGBT | $11,230,642 | $13,467,496 | ($2,236,854) |
20129 | SACHSE | CS | ON BUNKER HILL ROAD FROM SH 78 / NEW MILES ROAD | $7,614,464 | $10,783,209 | ($3,168,745) |
20223 | SUNNYVALE | CS | ON LAWSON ROAD FROM SCYENE ROAD / US 80 | $2,167,015 | $3,392,015 | ($1,225,000) |
25077 | SUNNYVALE | CS | ON TRIPP ROAD; FROM THE FALLS DRIVE / BELT LINE ROAD | $800,000 | $0 | $800,000 |
25076 | SUNNYVALE | CS | ON COLLINS ROAD; FROM TRIPP ROAD / TOWN EAST BLVD | $450,000 | $0 | $450,000 |
11747 | VARIOUS | CS | WINTERGREEN ROAD FROM DUNCANVILLE ROAD EAST OF STEWART BRANCH CREEK / AND DUNCANVILLE ROAD FROM WINTERGREEN TO SOUTH OF STEWART BRANCH CREEK | $3,130,000 | $44,330 | $3,085,670 |
20132 | VARIOUS | CS | ON MILLER ROAD FROM GARLAND EAST CITY LIMITS / ROWLETT WEST CITY LIMITS | $9,949,496 | $0 | $9,949,496 |
21032 | VARIOUS | CS | ON BELT LINE RD FROM EAST OF ALBA RD TO EAST OF SUNRISE RD / ON SUNRISE RD FROM BELT LINE RD TO SOUTH OF BELT LINE RD | $18,050,000 | $0 | $18,050,000 |
21032.3 | VARIOUS | CS | ON SUNRISE/FERRIS RD FROM SOUTH OF VAN ROAD / LOOP 9 FRONTAGE ROAD | $5,400,000 | $0 | $5,400,000 |
21032.2 | VARIOUS | CS | ON SUNRISE RD FROM SOUTH OF BELT LINE ROAD / FERRIS ROAD | $1,200,000 | $0 | $1,200,000 |
21032.4 | VARIOUS | CS | ON BELT LINE RD FROM EAST OF SUNRISE RD / E OF MASON RD | $6,090,000 | $0 | $6,090,000 |
11635 | VARIOUS | VA | M&O - IMPLEMENTATION/ADMINISTRATION OF AIR QUALITY AND TRANSPORTATION PROJECTS FUNDED WITH RTR FUNDS | $511,392 | $3,801,481 | ($3,290,089) |
11779 | VARIOUS | VA | DART ITS SYSTEM INTEGRATION - INTERCONNECT LRT, TRE, PARATRANSIT, & BUS INTO ONE SYSTEM | $1,590,720 | $1,263,686 | $327,034 |
20168 | VARIOUS | VA | EAST COTTON BELT PASSENGER RAIL CORRIDOR (DALLAS COUNTY SECTION) FROM DFWIA / NORTH CENTRAL/RED LINE | $1,301,471 | $1,301,461 | $10 |
20254.2 | VARIOUS | VA | HOV OPERATIONS OUTSIDE DART SERVICE AREA | $4,580,328 | $0 | $4,580,328 |
20255 | VARIOUS | VA | METROPOLITAN PLANNING ORGANIZATION (MPO) PLANNING SUPPORT AND ASSISTANCE FOR SURFACE TRANSPORTATION PROJECTS | $810,869 | $4,548,819 | ($3,737,950) |
20256 | VARIOUS | VA | EXPEDITE 404 AND 408 PERMITS AND IMPLEMENT REGIONAL MITIGATION BANK | $1,160,000 | $152,807 | $1,007,193 |
20267 | VARIOUS | VA | M&O - SAFETY ASSURANCE REVIEWS (SAR) AT VARIOUS LOCATIONS | $210,192 | $210,192 | $0 |
11661 | VARIOUS | VA | EXPEDITE SECTION 404 AND 408 PERMITS AND IMPLEMENT REGIONAL MITIGATION BANK | $800,000 | $1,032,770 | ($232,770) |
11679 | VARIOUS | VA | PLANNING SUPPORT & TECHNICAL EXPERTISE FOR IMPLEMENTATION OF PASSENGER RAIL IN REGIONAL RAIL CORRIDORS | $1,100,000 | $595,761 | $504,239 |
11677 | VARIOUS | VA | EQUITABLE TRANSIT FARE DEMONSTRATION PROGRAM / VARIOUS LOCATIONS WITHIN 16-COUNTY REGION | $1,000,000 | $8,950 | $991,050 |
25067 | VARIOUS | VA | ELECTRIC BUSES FOR DFW INTERNATIONAL AIRPORT TERMINAL GATE EXPANSION | $3,500,000 | $3,500,000 | $0 |
25090 | VARIOUS | VA | ON US 75 FROM DALLAS COUNTY LINE TO SH 121 / TECHNOLOGY OR OTHER CONSTRAINED CORRIDORS; COULD BE EXPANDED TO OTHER CORRIDORS IN THE FUTURE | $925,000 | $0 | $925,000 |
25101.1 | VARIOUS | VA | ENHANCING MOBILITY WITHIN THE SOUTHERN DALLAS INLAND PORT PROJECT / BOUNDED BY ANN ARBOR TO THE NORTH, TRINITY RIVER TO THE EAST, DALLAS/ELLIS CL TO THE SOUTH, & IH 35E TO THE WEST | $1,535,360 | $0 | $1,535,360 |
16001 | VARIOUS | VA | REGIONAL SCRAP TIRE ABATEMENT PROGRAM DEVELOPMENT AND IMPLEMENTATION TO REDUCE ENV ISSUES FROM ILLEGAL DUMPING | $790,000 | $0 | $790,000 |
16005 | VARIOUS | VA | LOVE FIELD SURFACE TRANSPORTATION PLANNING STUDY (MOCKINGBIRD) FROM SH 183 / TO DALLAS NORTH TOLLWAY AND FROM STEMMONS FREEWAY TO MOCKINGBIRD LANE | $500,000 | $0 | $500,000 |
21032.1 | VARIOUS | VA | SOUTH DALLAS INLAND PORT BOUNDED BY LOOP 9 TO THE SOUTH, SH 342/LANCASTER HUTCHINS RD TO THE WEST, / NORTH OF PLEASANT RUN RD TO THE NORTH, AND IH 45 TO THE EAST | $380,000 | $0 | $380,000 |
11981.2 | WILMER | CS | PLEASANT RUN ROAD FROM LANCASTER-HUTCHINS / MILLERS FERRY ROAD | $15,423,000 | $0 | $15,423,000 |